Completed the Directional Control Assembly. This includes the framework needed to hold the directional control motor in place and the gear on the upper shaft of the front wheel. I had the gear attachment ring made at the NAPA (Rt. 9, Natick) machine shop.
Archives
All posts for the month February, 1981
Completed the battery cage, altered from Tod’s measurements to fit a pair of 6v gel cells (in series).
Completed construction and assembly of the upper triangle portion of Microtron’s frame.